under construction
1938/39
A&R Lemwerder
Installation of a 9 hp Penta petrol engine with aux shaft outlet, installation of a salon skylight, conversion of the main mast with folding device (tabernacle),
Comfort conversions in salon and interior
1946/47
Torquay und London / UK
Repair and maintenance work after towing transfers and deck transport from Germany
1949
Torquay / UK
Installation of a Prestige toaster and an Eddystone tube receiver for the time signal on KW, equipment for blue water voyage
1951
Auckland / NZ, West Haven
Overhaul of the boat after Atlantic and Pacific voyages; replacement of the iron keel bolts by keel bolts made of monel, equipment for Pacific voyage; presumably coating of the underwater area with copper sheets as protection against fouling
1952
Marquesas / Tahiti
constant overhaul of protective coatings and removal of underwater fouling
1953
Hawaii
Overhaul of protective coatings and removal of underwater fouling, inspection of new Monel keel bolts
1955
Victoria B.C.
Removal of the copper sheets in tar from the underwater hull, replacement of the Penta petrol engine with a 4 cylinder Gray Marine petrol engine
ca. 1966
Victoria B.C.
probably coating the softwood deck with GRP
ca. 1974
Victoria B.C.
Jeff Ridley
Laying of a teak bar deck on top of the previous deck (probably original canvas cover deck
1979/80
North Saanich, Sidney, Bent Jesperson
new mizzen mast (Sitka Spruce)
new stainless rigging, Interior modifications, moving toilet forward, cover over the stove for use as chart table, two burner primus stove on gymbals extension of the forward bench, removal of the stove bulkhead; change offset shaft to centre line, new cockpit and horn timber, change of water tanks, new SL anchor winch, new bronze Barient sheet winches, new Walker taffrail log, VHF radio
1992
Victoria B.C.
complete mast rebuild, tabernackle rebuild
1994
Victoria B.C.
new main boom & fittings
1996/97
Victoria B.C.
removal of the toilet room, installation of a locker with chart table; removal of reling support